Site #1 · Future phases
Built in phases.
Room to grow.
Phase 1 opens with the banked 200m oval, field events, courts and a cheer floor. Each later phase adds to the same building.
Ice & turf
Seasonal ice on the infield from November through March: public skating, youth and adult hockey, hockey tournaments and curling. Roll-out turf the rest of the year for youth soccer and football camps, and the rink boards stay up for inline hockey.
“Field” expansion
A 100 × 180 ft west wing built for field events: long and triple jump, pole vault, high jump and throws move out of the infield, plus a weight room. Meets, courts and training can run at the same time.
Cheer
A 100 × 180 ft east cheer hall, sized to host cheer competitions, with its own floor so the main infield stays free for track and courts.
Floor plans: Phases 2 + 3 (top); Phase 1 with Phase 3 (west) and Phase 4 (east) shown dashed (bottom). Renderings are concepts, not photos of a finished building. Phase timing depends on funding.